City Rail Link construction

Following the construction of the City Rail Link between Britomart and Mt Eden, from enabling works to project completion

164 photos in this gallery. Showing photos 22 - 42

The public space is also used by street performers such as Zaktakular, seen here

15 May 2016

The public space is also used by street performers such as Zaktakular, seen here

Construction with is still ongoing however; the other shelter may be coming down as well

15 May 2016

Construction with is still ongoing however; the other shelter may be coming down as well

The Downtown shopping centre, with one month left to go prior to demolition. Part of the CRL will be constructed at the same time as this redevelopment, expected to be open in October 2018

15 May 2016

The Downtown shopping centre, with one month left to go prior to demolition. Part of the CRL will be constructed at the same time as this redevelopment, expected to be open in October 2018

From the shopping centre, the demolition of the shelter also allows this view of the Britomart Transport Centre, formerly the post office

15 May 2016

From the shopping centre, the demolition of the shelter also allows this view of the Britomart Transport Centre, formerly the post office

On Albert Street, traffic management has ramped up as more of Albert and Victoria Streets are closed

15 May 2016

On Albert Street, traffic management has ramped up as more of Albert and Victoria Streets are closed

A single lane is open on Victoria Street, with workers using Stop/Go signs to control traffic. Auckland Transport have recommended for some time for people to use public transport instead

15 May 2016

A single lane is open on Victoria Street, with workers using Stop/Go signs to control traffic. Auckland Transport have recommended for some time for people to use public transport instead

Traffic lights are switched off completely now, with even pedestrians under the control of road workers

15 May 2016

Traffic lights are switched off completely now, with even pedestrians under the control of road workers

Buses also get caught up in the traffic however, with the one lane portion being on the Inner Link's route

15 May 2016

Buses also get caught up in the traffic however, with the one lane portion being on the Inner Link's route

Noise barriers along construction contain details about the eventual benefits of the CRL

15 May 2016

Noise barriers along construction contain details about the eventual benefits of the CRL

Victoria Street dug up as storm drain relocation works continue

15 May 2016

Victoria Street dug up as storm drain relocation works continue

The Griffiths building which once stood here is now completely demolished

15 May 2016

The Griffiths building which once stood here is now completely demolished

The now closed Downtown shopping mall is now fenced off to the public, with demolition work to commence in the next few weeks

6 June 2016

The now closed Downtown shopping mall is now fenced off to the public, with demolition work to commence in the next few weeks

The interim public space outside Britomart has seen some innovative uses during its limited life, such as this basketball hoop on a trailer

6 June 2016

The interim public space outside Britomart has seen some innovative uses during its limited life, such as this basketball hoop on a trailer

The site of the first sod turning which occurred two days prier, now sealed over

6 June 2016

The site of the first sod turning which occurred two days prier, now sealed over

The fenced off Downtown Shopping Centre

6 June 2016

The fenced off Downtown Shopping Centre

The entire shopping mall is fenced off, closing the northern footpath on Customs St

6 June 2016

The entire shopping mall is fenced off, closing the northern footpath on Customs St

New signage on Victoria St ensures pedestrians that stores are open as usual

6 June 2016

New signage on Victoria St ensures pedestrians that stores are open as usual

The demolition of the Downtown Shopping Centre is now under way

24 July 2016

The demolition of the Downtown Shopping Centre is now under way

The demolition of the shopping centre has closed the northern footpath of Customs Street

24 July 2016

The demolition of the shopping centre has closed the northern footpath of Customs Street

While enabling works on Albert Street ramp up, the street appears to be one long road works site

24 July 2016

While enabling works on Albert Street ramp up, the street appears to be one long road works site

Albert Street has several lane restrictions along its length from Quay Street to Victoria Street

24 July 2016

Albert Street has several lane restrictions along its length from Quay Street to Victoria Street